Freight aggregates service from Westbury Lafarge to Woking Down Yard Freightliner Heavy Haul. Timed as a diesel locomotive with 1800 tonnes trailing load at a maximum speed of 60 mph. Runs as required.Runs to yards/terminals as required.Overlayed schedule H17322 runs Thursdays and Fridays effective from 02/01/2025 to 03/01/2025. A dynamic link to the current day's instance of this train is here: Today's H17322.
|
|