TrackIT! - 7A31 (ZZ Hanwell Bridge Loop - Acton Terminal Complex)

 - Location Search  - Maps  - Reports  -  -
 


Freight aggregates service from Hanwell Bridge Loop to Acton Terminal Complex.
Timed as a diesel locomotive with 2200 tonnes trailing load at a maximum speed of 45 mph.
Runs as required.
Runs to yards/terminals as required.
Permanent schedule H17489 runs weekdays effective from 16/12/2024 to 16/05/2025. A dynamic link to the current day's instance of this train is here: Today's H17489.

Next scheduled event: Departure from Hanwell Bridge Loop (UGL) @ 05:36. This train originates here.


Location Action WTT Public Actual/Est Var Plt (S) Plt (A) Lin (S) Lin (A) Pth (S) Pth (A) Action
Friday 04 April 2025
Hanwell Bridge Loop Depart 05:36       UGL   RL      
Hanwell Pass 05:37       3        
West Ealing Pass 05:39       4   RL      
Acton West Pass 05:43         GL   RL    
Acton Terminal Complex Arrive 05:47              

Contains Information of Network Rail Infrastructure Limited licensed under this licence.
TrackIT! is provided as a free service, but obviously costs money to run. If you like what you see, please consider making a donation.
TrackIT! Copyright © 2012-2024, James Uppington. All rights reserved.

TrackIT! uses cookies to remember your site preferences and provide an enhanced user experience. By continuing use of this site, you are agreeing to TrackIT!'s use of cookies for this purpose.