TrackIT! - 6V53 (ZZ Oxford Banbury Road Freightliner Heavy Haul - East Usk Yard Freightliner Heavy Haul)
-
Location Search
-
Maps
-
Reports
-
Automatically refresh
-
Show timing estimates
Trust train ID: 746V53CH12.
Freight aggregates service from
Oxford Banbury Road Freightliner Heavy Haul
to
East Usk Yard Freightliner Heavy Haul
.
Timed as a diesel locomotive with 600 tonnes trailing load at a maximum speed of 60 mph.
Runs to yards/terminals as required.Overlayed schedule
H21956
runs Thursdays effective on 12/12/2024 only. A dynamic link to the current day's instance of this train is here:
Today's H21956
.
Activated manually at 12/12/2024 08:40:22.
Location
Action
WTT
Public
Actual/Est
Var
Plt (S)
Plt (A)
Lin (S)
Lin (A)
Pth (S)
Pth (A)
Action
Thursday 12 December 2024
Oxford Banbury Road Freightliner Heavy Haul
Depart
10:38
10:14
24E
Oxford Parkway
Pass
10:40
10:15
25E
1
1
1
1
Dep (U) P1 from 1
Water Eaton Parkway
Arrive
10:13½
N/A
Dep (U) P1 from 1
Depart
10:15½
N/A
Oxford Banbury Road Sidings
Depart
10:11½
N/A
Dep (U)
Oxford Woodstock Road Junction
Pass
10:41½
10:17
24½E
1
Dep (U)
Oxford North Junction
Pass
10:44
10:22
22E
UML
1
Dep (U)
Oxford
Pass
10:46
10:24
22E
TL
UML
UML
4
Dep (U)
Hinksey North
Pass
10:47
Kennington Junction also listed as Kennington Junc
Pass
10:48½
10:29
19½E
1
Dep (U)
Radley
Pass
10:31
N/A
Dep (U) P2 from U
Culham
Pass
10:33½
N/A
Dep (U) P2 from U
Appleford
Pass
10:34½
N/A
Dep (U) P1 from U
Didcot North Junction
Pass
10:57
10:37
20E
3
Dep (U)
Foxhall Junction
Pass
11:01
RL
Milton Junction
Pass
11:03
GL
Steventon
Arrive
11:06
Depart
11:29½
Wantage Road
Pass
11:35
11:05
30E
RL
R
1
Dep (D) from R
Challow
Arrive
11:40
Dep (D) from R
Depart
11:50
11:29
21E
R
1
Uffington (Oxfordshire)
Pass
11:54
11:32
22E
D
1
Dep (D) from D
Swindon (Wilts)
Pass
12:06½
11:45
21½E
4
4
1
Dep (D) P4
Wootton Bassett Junction
Pass
12:13
11:52
21E
3
Dep (D) DM to DB
Hullavington
Arrive
12:25½
12:05
20½E
DGL
0
Dep (D)
Depart
12:34
12:28
6E
1
Chipping Sodbury
Arrive
12:40
N/A
Dep (D) DB to DB
Depart
12:40½
N/A
Westerleigh Junction
Pass
12:49½
12:43
6½E
D
1
Dep (D) DB to DB
Bristol Parkway
Arrive
12:56½
12:50
6½E
DGL
1
1
0
Dep (D) P1 to DT
Depart
13:12
13:22
10L
1
1
1
Patchway
Pass
13:14½
13:30
15½L
2
2
2
1
Dep (D) P2 to DT
Bristol Patchway Signal BL1536
Arrive
13:30½
N/A
Arr (D)
Pilning
Pass
13:18
13:35
17L
1
Dep (D) P2 to DT
Severn Tunnel Junction East
Pass
13:20½
13:37
16½L
D
1
Dep (D) from D
Severn Tunnel West
Pass
13:26
13:41
15L
D
1
Dep (D) from D
Severn Tunnel Junction
Pass
13:27½
13:44
16½L
3
3
RL
1
Dep (D) P3
Llanwern West Junction
Pass
13:40½
13:56
15½L
1
Dep (D)
East Usk Junction
Pass
13:42½
East Usk Yard Freightliner Heavy Haul
Arrive
13:48
14:03
15L
0
Contains Information of Network Rail Infrastructure Limited licensed under
this licence
.
TrackIT! is provided as a free service, but obviously costs money to run. If you like what you see, please consider making a
donation.
TrackIT! Copyright © 2012-2024, James Uppington. All rights reserved.
TrackIT! uses cookies to remember your site preferences and provide an enhanced user experience. By continuing use of this site, you are agreeing to TrackIT!'s use of cookies for this purpose.