TrackIT! - 6L63 (ZZ Barnby Dun Rockware Glass GB Railfreight - March Up Yard GB Railfreight)

 - Location Search  - Maps  - Reports  -  -
 


Freight industrial minerals service from Barnby Dun Rockware Glass GB Railfreight to March Up Yard GB Railfreight.
Timed as a diesel locomotive with 600 tonnes trailing load at a maximum speed of 60 mph.
Runs to yards/terminals as required.
Permanent schedule H24421 runs weekdays effective from 03/06/2024 to 13/12/2024. A dynamic link to the current day's instance of this train is here: Today's H24421.

Next scheduled event: Departure from Barnby Dun Rockware Glass GB Railfreight @ 20:30. This train originates here.


Location Action WTT Public Actual/Est Var Plt (S) Plt (A) Lin (S) Lin (A) Pth (S) Pth (A) Action
Barnby Dun Rockware Glass GB Railfreight Depart 20:30              
Kirk Sandall Junction Arrive 20:38              
Depart 20:43            
Bentley Junction Pass 20:46½              
Doncaster Pass 20:53       UF        
Doncaster St James Junction Pass 20:55         GL      
Doncaster Roberts Road Shed GB Railfreight Arrive 21:00              
Depart 21:51½            
Doncaster St James Junction Pass 21:56½              
Doncaster Bridge Junction Pass 21:57½         WSL      
Doncaster Decoy North Junction Pass 22:00              
Doncaster Down Decoy GB Railfreight Arrive 22:03              
Depart 22:09            
Doncaster Decoy South Junction Pass 22:11              
Bessacarr Junction Pass 22:12              
Gainsborough Trent Junctions Pass 22:30              
Gainsborough Lea Road Pass 22:31½              
Saxilby Pass 22:42½              
Pyewipe Junction Pass 22:47½              
West Holmes Junction Pass 22:48½              
Lincoln [Central] Pass 22:51       UM        
Pelham Street Junction Pass 22:51½              
Metheringham Pass 23:02½              
Sleaford North Junction Pass 23:13         UA      
Sleaford South Junction Pass 23:14½              
Quadring Signal WS7070 Pass 23:25½              
Spalding Pass 23:33       1        
Glinton Junction Pass 23:46½              
Werrington Junction Pass 23:50         SL      
New England North Junction Pass 23:57              
Friday 15 November 2024
Peterborough Virtual Quarry GB Railfreight Arrive 00:01              
Depart 01:22            
Peterborough Eastfield Junction Pass 01:24         SUD      
Peterborough Signals P458/465/466/470 Pass 01:26              
Peterborough Pass 01:27½       6        
Peterborough East Junction Pass 01:29              
Kings Dyke Pass 01:33              
Whittlesea Pass 01:35              
Eastrea Signal W6 Pass 01:37½              
Three Horse Shoes Pass 01:39              
March West Junction Pass 01:48              
March Pass 01:48½       2        
March South Arrive 01:50½              
Depart 01:54            
March Up Yard GB Railfreight Arrive 01:59              

Contains Information of Network Rail Infrastructure Limited licensed under this licence.
TrackIT! is provided as a free service, but obviously costs money to run. If you like what you see, please consider making a donation.
TrackIT! Copyright © 2012-2024, James Uppington. All rights reserved.

TrackIT! uses cookies to remember your site preferences and provide an enhanced user experience. By continuing use of this site, you are agreeing to TrackIT!'s use of cookies for this purpose.