TrackIT! - 2K17 (EM Doncaster - Peterborough)

 - Location Search  - Maps  - Reports  -  -
 

Trust train ID: 232K17MO09.
East Midlands Railway ordinary passenger service from Doncaster to Peterborough.
Timed as a Class 158, 168, 170 or 175 DMU at a maximum speed of 100 mph.
Permanent schedule C61211 runs Saturdays effective from 08/06/2024 to 14/12/2024. A dynamic link to the current day's instance of this train is here: Today's C61211.
Activated automatically at 09/11/2024 13:15:07.


Location Action WTT Public Actual/Est Var Plt (S) Plt (A) Lin (S) Lin (A) Pth (S) Pth (A) Action
Peterborough Signal P466 Depart     16:09½ N/A       Dep (U) from 1
Saturday 09 November 2024
Doncaster Formed by 2K10 EM Peterborough (12:02) - Doncaster (14:03) Dep (U) P3 from 1
Depart 14:15 14:15 14:15 RT 3B 3 1 1
Doncaster Signal D276 Depart     14:15 N/A       Dep (U) P3 from 1
Doncaster Bridge Junction Pass 14:16½   14:16 ½E   WSL 1 1 Dep (U) from 1
Doncaster Decoy North Junction Pass 14:17½   14:18 ½L   O 1 Dep (U) from O
Doncaster Decoy South Junction Pass 14:18½   14:19 ½L   L 1 Dep (U) from L
Doncaster Signal D236 Depart     14:19 N/A       Dep (U) from L
Bessacarr Junction Pass 14:20   14:20 RT   L 1 Dep (U) from L
Gainsborough Trent Junctions Pass 14:36   14:36 RT        
Gainsborough Lea Road Arrive 14:38 14:38 14:38 RT 1   0 Dep (U) P1 from M
Depart 14:39 14:39 14:39 RT 1 M 1
Saxilby Arrive 14:50 14:50 14:50 RT 1   0 Dep (U) P1 from M
Depart 14:50½ 14:50 14:51 ½L 1 M 1
Pyewipe Junction Depart     14:56½ N/A       Dep (U) from M
West Holmes Junction Pass 14:58   14:57 1E   F 1 Dep (U) from F
Lincoln [Central] Arrive 15:00½ 15:01 14:59 1½E 3A 3   0 Dep (U) P3 from S
Depart 15:02½ 15:02 15:02 ½E 3 S 3
Pelham Street Junction Pass 15:03              
Metheringham Arrive 15:14 15:14 15:14 RT 2   0 Dep (U) P2 from M
Depart 15:14½ 15:14 15:14 ½E 2 M 1
Ruskington Arrive 15:22½ 15:23 15:22 ½E 2   0 Dep (U) P2 from W
Depart 15:23½ 15:23 15:23 ½E 2 W 1
Sleaford North Junction Pass 15:27   15:26 1E   S 1 Dep (U) from S
Sleaford Arrive 15:31 15:31 15:31 RT 1     0  
Depart 15:32 15:32 15:32 RT      
Sleaford South Junction Pass 15:34½   15:34 ½E   M 1 Dep (U) from M
Quadring Signal WS7070 Pass 15:43½   15:43 ½E   M 1 Dep (U) from M
Spalding Arrive 15:51 15:51 15:51 RT 1 1   0 Dep (U) P1 from M
Depart 15:52 15:52 15:52 RT 1 M 2
Glinton Junction Pass 16:03½   16:04 ½L   S 1 Dep (U) from S
Werrington Junction Pass 16:06   16:06 RT   SL S 2 Dep (U) from S
Peterborough Arrive 16:11 16:11 16:11 RT 1B 1   0 Arr (U) P1
Forms 2K16 EM Peterborough (16:42) - Lincoln [Central] (17:55)

Contains Information of Network Rail Infrastructure Limited licensed under this licence.
TrackIT! is provided as a free service, but obviously costs money to run. If you like what you see, please consider making a donation.
TrackIT! Copyright © 2012-2024, James Uppington. All rights reserved.

TrackIT! uses cookies to remember your site preferences and provide an enhanced user experience. By continuing use of this site, you are agreeing to TrackIT!'s use of cookies for this purpose.