Freight light locomotive service from Barrow Hill Up Sidings 2 and 3 Freightliner Heavy to Earles Sidings (Hope) Freightliner Heavy Haul. Timed as a diesel locomotive at a maximum speed of 75 mph. Runs to yards/terminals as required.Permanent schedule H21214 runs weekdays effective from 03/06/2024 to 13/12/2024. A dynamic link to the current day's instance of this train is here: Today's H21214.
|
|