TrackIT! - 2K21 (EM Doncaster - Peterborough)

 - Location Search  - Maps  - Reports  -  -
 

Trust train ID: 232K21MS02.
East Midlands Railway ordinary passenger service from Doncaster to Peterborough.
Timed as a Class 158, 168, 170 or 175 DMU at a maximum speed of 100 mph.
Permanent schedule C61212 runs Saturdays effective from 08/06/2024 to 14/12/2024. A dynamic link to the current day's instance of this train is here: Today's C61212.
Activated automatically at 02/11/2024 15:15:12.


Location Action WTT Public Actual/Est Var Plt (S) Plt (A) Lin (S) Lin (A) Pth (S) Pth (A) Action
Peterborough Signal P466 Depart     18:14½ N/A       Dep (U) from 1
Saturday 02 November 2024
Doncaster Formed by 2K12 EM Peterborough (14:00) - Doncaster (16:01) Dep (U) P8 from 2
Depart 16:15 16:15 16:14 1E 8 8 2 1
Doncaster Signal D276 Depart     16:14½ N/A       Dep (U) P8 from 2
Doncaster Bridge Junction Pass 16:16½   16:16 ½E   WSL 1 1 Dep (U) from 1
Doncaster Decoy North Junction Pass 16:17½   16:18 ½L   O 1 Dep (U) from O
Doncaster Decoy South Junction Pass 16:18½   16:19 ½L   L 1 Dep (U) from L
Doncaster Signal D236 Depart     16:18½ N/A       Dep (U) from L
Bessacarr Junction Pass 16:20   16:20 RT   L 1 Dep (U) from L
Gainsborough Trent Junctions Pass 16:36   16:35 1E        
Gainsborough Lea Road Arrive 16:38 16:38 16:37 1E 1   0 Dep (U) P1 from M
Depart 16:39 16:39 16:38 1E 1 M 1
Saxilby Arrive 16:50 16:50 16:49 1E 1   0 Dep (U) P1 from M
Depart 16:51 16:51 16:50 1E 1 M 1
Pyewipe Junction Depart     16:56½ N/A       Dep (U) from M
West Holmes Junction Pass 16:58½   16:57 1½E   F 1 Dep (U) from F
Lincoln [Central] Arrive 17:01 17:01 17:00 1E 5A 5   0 Dep (U) P5 from S
Depart 17:04 17:04 17:03 1E 5 S 3
Pelham Street Junction Pass 17:04½              
Metheringham Arrive 17:15½ 17:16 17:15 ½E 2   0 Dep (U) P2 from M
Depart 17:16 17:16 17:16 RT 2 M 1
Ruskington Arrive 17:24 17:24 17:24 RT 2   0 Dep (U) P2 from W
Depart 17:25 17:25 17:28 3L 2 W 1
Sleaford North Junction Pass 17:31½   17:32 ½L   S 1 Dep (U) from S
Sleaford Arrive 17:35½ 17:36 17:36 ½L 1     0  
Depart 17:36½ 17:36 17:38 1½L      
Sleaford South Junction Pass 17:39   17:40 1L   M 1 Dep (U) from M
Quadring Signal WS7070 Pass 17:48   17:49 1L   M 1 Dep (U) from M
Spalding Arrive 17:55½ 17:56 17:57 1½L 1 1   0 Dep (U) P1 from M
Depart 17:56½ 17:56 17:58 1½L 1 M 2
Glinton Junction Pass 18:08   18:09 1L   S 1 Dep (U) from S
Werrington Junction Pass 18:10½   18:11 ½L   SL S 2 Dep (U) from S
Peterborough Arrive 18:16 18:16 18:16 RT 1B 1   0 Arr (U) P1
Forms 2K18 EM Peterborough (18:29) - Doncaster (20:33)

Contains Information of Network Rail Infrastructure Limited licensed under this licence.
TrackIT! is provided as a free service, but obviously costs money to run. If you like what you see, please consider making a donation.
TrackIT! Copyright © 2012-2024, James Uppington. All rights reserved.

TrackIT! uses cookies to remember your site preferences and provide an enhanced user experience. By continuing use of this site, you are agreeing to TrackIT!'s use of cookies for this purpose.