Freight aggregates service from Barrow Hill Up Sidings 2 and 3 Freightliner Heavy to Tunstead Sidings. Timed as a diesel locomotive with 600 tonnes trailing load at a maximum speed of 60 mph. Runs to yards/terminals as required.Overlayed schedule H21804 runs Tuesdays, Wednesdays, Thursdays and Fridays effective from 27/08/2024 to 30/08/2024. A dynamic link to the current day's instance of this train is here: Today's H21804.
|
|