Freight aggregates service from Merehead Quarry Freightliner Heavy Haul to Hanwell Bridge Loop. Timed as a diesel locomotive with 4200 tonnes trailing load at a maximum speed of 45 mph. Runs to yards/terminals as required.Overlayed schedule H17488 runs Fridays effective on 31/01/2025 only. A dynamic link to the current day's instance of this train is here: Today's H17488.
Next scheduled event: Departure from Merehead Quarry Freightliner Heavy Haul @ 01:57. This train originates here.
|
|