Freight metals service from Toton Up Sidings/New Bank to Boston Sleaford Sidings. Timed as a diesel locomotive with 600 tonnes trailing load at a maximum speed of 60 mph. Runs to yards/terminals as required.Permanent schedule H19111 runs Fridays effective from 07/06/2024 to 13/12/2024. A dynamic link to the current day's instance of this train is here: Today's H19111.
Next scheduled event: Departure from Toton Up Sidings/New Bank @ 12:30. This train originates here.
|
|