Freight aggregates service from Barrow Hill Up Sidings 2 and 3 Freightliner Heavy to Tunstead Sidings Freightliner Heavy Haul. Timed as a diesel locomotive with 600 tonnes trailing load at a maximum speed of 60 mph. Runs to yards/terminals as required.Permanent schedule H21804 runs Tuesdays, Wednesdays, Thursdays and Fridays effective from 29/10/2024 to 13/12/2024. A dynamic link to the current day's instance of this train is here: Today's H21804.
Next scheduled event: Departure from Barrow Hill Up Sidings 2 and 3 Freightliner Heavy @ 01:11. This train originates here.
|
|